Trust. Honesty. Experience.

BUSINESS INVESTOR

DELIVERING OPPORTUNITIES

European Mineral Water Project

Only 3% of the water in the world is fresh water, and only 0,02–0,03% of fresh water is drinkable for humans. More than 30 countries in the world are suffering from chronic water shortages. The situation is getting worse, threatening a global water crisis in the decades ahead.

Premium grade bottled mineral water is in increasingly high demand in the developed world and the demand is increasing in the developing world as well as improving living standards permit.

Water becoming more valuable than gold

by Patrick M. Sheridan, April 24, 2014: 2:49 PM ET

The bottled mineral water segment has experienced an explosive growth since the early 2000’s and continues to remain the fastest growing segment of the beverage industry.

A premier mineral water well project of three wells, complete with water mining licenses. Three mineral water wells next to each other recently built to the highest technological standards. The first well is 640 meters deep (2,100 feet), the second well is 347 meters deep (1,140 feet) the third well is 208 meters deep (670 feet).

Water from all three water wells is officially classified as mineral water.
 

We are looking for a Joint Venture Partner to utilise the project, or alternative, to sell out the project as is.

Water scarcity could be liquid gold for investors

by Rachel Koning Beals, March 1, 2013 10:01 AM ET

Our Offer Includes:

  • Three mineral water wells next to each other recently built to the highest technological standards. The first well is 640 meters deep (2,100 feet), the second well is 347 meters deep (1,140 feet) the third well is 208 meters deep (670 feet).

  • All applicable mining licenses and permissions to mine the water are in hand.

  • 1 Hectare (2.47 acres) of industrially zoned land that surrounds all three water wells.

  • The land is complete and ready with permissions for the development of a bottling plant. The land can be accessed directly form a paved road which connects to a main road within a few kilometers.

  • Additional 5 Hectare (12,5 acre) is available next to the site for further development.

  • Public utilities (electricity, etc.) are within yards of the property. According to the applicable building rules for property are highly suitable for a bottling plant.

  • New public road directly to the site had been build for very high weight drilling equipments (gas exploration works had been carried out on the site).

  • The combined water yield for the three water wells is 1,324,800,000 liters per year (3,629,600 liters per day).

Executive Summary

Business Investor Ltd.

Switzerland

info@business-investor.com

  • Facebook Social Icon
  • Twitter Social Icon
  • Google+ Social Icon
  • YouTube Social  Icon
  • Pinterest Social Icon
  • Instagram Social Icon

All rights reserved.

©2018 by Business Investor Ltd.